Waterproof PVC Dog Training Leash Non Slip Long Lead For Walking, Running & Recall Training From 5.9 Ft To 32.8 Ft black 5.9 Ft($47.98Value)

$47.98

Category -- More Pet Supplies
Share --

Take your dogs training and outdoor adventures to the next level with a durable leash designed for performance and control. This long dog training leash is crafted from waterproof PVC material that resists dirt, moisture, and everyday wear, making...

RevType 2
Manufacturer Inspire Select
Sku BMOQOES5NX1
Identity 45188662243